Skip to content
11x19 Water Meter Pit Base Section 25-Ton
Underground Basin with Precast Structures
12x20 Vault Base Section on Truck
3x4 Box Culvert Loaded on CCP Truck
Water Meter Pit Base & Riser Installed
Assembling a Structure On-Site
11x19.5 Water Meter Pit Submittal Drawing
Preplumbed Water Meter Pit Set in Place
Box Culvert Post Tensioning in Field
6x22.5 8-inch Water Meter Pit Assembled
6x7 Box Culvert Sections in CCP Yard
5x12 Box Culvert Skewed End Section
11x19 Water Meter Pit Base Section
4x8 Box Culvert Sections #1 #2 #3
Underground Detention Basin Installed
Detention Basin Structure Installed
4x8 Post Tension Box Culvert Installed
Installation of CCP Precast
Boat Ramp into Delaware RIver
Basin Structure Installed Prior to Backfill
Water Meter Pit being Lowered into Place
6x22.5 Water Meter Pit on Jobsite
5x12 Culvert Sections #1 #2
CCP Truck Loaded with Various Inlet Boxes
Water Meter Pit with Preplumbed Piping and Valves
Various Precast Products at Jobsite
Water Meter Pit 25-Ton Section
Water Meter Pit Being Set in Field
6x7 Box Culvert Sections #97 #98
22x14 Precast Bridge - 2nd Section
Installing CCP Products
6x22.5 Water Meter Pit
6x7 Box Culvert in CCP Yard
CCP Precast Stored On-Site
16x6.25 Boat Ramp Submittal Drawing
4x8 Box Culvert Submittal Drawing
5x12 Box Culvert Installed
11x19 Water Meter Pit Installed
2x15 Trench & Cap Box Culvert
5x12 Culvert Sections #1 #2 #3
4x8 Box Culvert Sections
22x14 Precast Bridge - 1st Section
22x14 Two Section Bridge Installed
5x12 Box Culvert Submittal Drawing
Special DW Endwall for Triple 36 RCP
11x19 Water Meter Pit Installed on Site
11x19 Water Meter Pit Preplumbed Bottom
12x20 Valve Vault Assembled at CCP
22x14 Precast Bridge Spanning Creek
22x14 Two Section Bridge - 2nd Section
4x8 Box Culvert Sections #6 #7 #8
5x8 Basin Outlet Structure
6x7 Box Culvert Lowered into Place
6x7 Box Culvert
8x10 Twin Cell Box Culvert in CCP Yard
Box Culvert Section Installed at Night
Twin Cell Box Culvert on CCP Truck
6x22.5 Water Meter Pit Submittal Drawing
Precast Structures Stored On-Site
Trench & Cap Box Culvert Submittal Drawing
PHL Airport Load-Rated Inlet w/ Footer
Off-Loading 11x19.5 Water Meter Pit
Modified Inlet Box Off-Loaded at Jobsite
Lowering a Riser Section into Place
Large Modified Storm Sewer Inlet Box
CCP Precast at Construction Site
5x12 Culvert Section w/ Endwall
5x12 Box Culvert Wing Wall
5x12 Box Culvert Post-Tensioning
Underground Basin with Precast Structures
Underground Basin with Precast Structures
FRONTjay2023-02-01T19:05:41-05:00
Page load link