-
11x19 Water Meter Pit Installed
-
11x19 Water Meter Pit Base Section 25-Ton
-
11x19 Water Meter Pit Installed on Site
-
11x19 Water Meter Pit Preplumbed Bottom
-
11x19 Water Meter Pit Base Section
-
12x20 Valve Vault Assembled at CCP
-
12x20 Vault Base Section on Truck
-
2x15 Trench & Cap Box Culvert
-
22x14 Precast Bridge - 1st Section
-
22x14 Precast Bridge - 2nd Section
-
22x14 Precast Bridge Spanning Creek
-
22x14 Two Section Bridge - 2nd Section
-
22x14 Two Section Bridge Installed
-
3x4 Box Culvert Loaded on CCP Truck
-
4x8 Box Culvert Sections
-
4x8 Box Culvert Sections #1 #2 #3
-
4x8 Box Culvert Sections #6 #7 #8
-
4x8 Post Tension Box Culvert Installed
-
5x12 Culvert Sections #1 #2
-
5x8 Basin Outlet Structure
-
6x22.5 8-inch Water Meter Pit Assembled
-
6x7 Box Culvert Sections #97 #98
-
6x7 Box Culvert Lowered into Place
-
6x7 Box Culvert Sections in CCP Yard
-
6x7 Box Culvert
-
8x10 Twin Cell Box Culvert in CCP Yard
-
Boat Ramp into Delaware RIver
-
Box Culvert Post Tensioning in Field
-
Box Culvert Section Installed at Night
-
CCP Truck Loaded with Various Inlet Boxes
-
Twin Cell Box Culvert on CCP Truck
-
Water Meter Pit 25-Ton Section
-
Water Meter Pit Base & Riser Installed
-
Water Meter Pit being Lowered into Place
-
Water Meter Pit Being Set in Field
-
Water Meter Pit with Preplumbed Piping and Valves
-
5x12 Box Culvert Submittal Drawing
-
11x19.5 Water Meter Pit Submittal Drawing
-
16x6.25 Boat Ramp Submittal Drawing
-
4x8 Box Culvert Submittal Drawing
-
6x22.5 Water Meter Pit Submittal Drawing
-
Precast Structures Stored On-Site
-
Preplumbed Water Meter Pit Set in Place
-
Special DW Endwall for Triple 36 RCP
-
Underground Detention Basin Installed
-
Various Precast Products at Jobsite
-
Trench & Cap Box Culvert Submittal Drawing
-
PHL Airport Load-Rated Inlet w/ Footer
-
Off-Loading 11x19.5 Water Meter Pit
-
Modified Inlet Box Off-Loaded at Jobsite
-
Lowering a Riser Section into Place
-
Large Modified Storm Sewer Inlet Box
-
Installing CCP Products
-
Installation of CCP Precast
-
6x7 Box Culvert in CCP Yard
-
Assembling a Structure On-Site
-
Basin Structure Installed Prior to Backfill
-
CCP Precast at Construction Site
-
CCP Precast Stored On-Site
-
Detention Basin Structure Installed
-
6x22.5 Water Meter Pit
-
6x22.5 Water Meter Pit on Jobsite
-
5x12 Culvert Sections #1 #2 #3
-
5x12 Culvert Section w/ Endwall
-
5x12 Box Culvert Wing Wall
-
5x12 Box Culvert Skewed End Section
-
5x12 Box Culvert Installed
-
5x12 Box Culvert Post-Tensioning
-
Underground Basin with Precast Structures
-
Underground Basin with Precast Structures
-
Underground Basin with Precast Structures
-
-
-
-
-
-
-
-
-
-
-
-